Batch 1 Starts 23 Nov: UPSC GS Foundation 2028/29 Enroll Now

Pumped Storage Hydropower

About Pumped Storage Hydropower

  • What it is: a form of energy storage that uses two water reservoirs at different heights:
    • Charging: surplus electricity (for example, from solar in the daytime) pumps water to the upper reservoir.
    • Discharging: during peak demand, water flows down through turbines to generate electricity.
  • Round-trip efficiency: about 70% to 80%.
  • Called the “water battery”; it is the largest form of long-duration energy storage worldwide.

Types

  • On-stream (open loop): connected to a natural river.
  • Off-stream (closed loop): reservoirs not connected to a river, with fewer environmental impacts and faster approvals.

India’s Status (August 2026)

  • Operational: 7.43 GW across 10 projects. India ranks fourth globally in installed pumped storage, after China, Japan and the US.
  • Under construction: 15.87 GW across 11 projects.
  • Potential: about 345 GW across 320 sites identified by the Central Electricity Authority (CEA). The Western Region has the highest potential (Maharashtra leads).
  • CEA roadmap: targets about 100 GW of pumped storage by 2035-36.
  • Examples: Tehri PSP (Uttarakhand), Kadamparai (Tamil Nadu), Srisailam and Nagarjunasagar (Andhra Pradesh/Telangana), and the Pinnapuram integrated renewable energy project (Andhra Pradesh).

Policy Measures

  • Guidelines for Pumped Storage Projects (2023): by the Ministry of Power.
  • ISTS charge waiver for eligible projects.
  • VGF for grid-scale storage (November 2026): includes 60 GWh of pumped storage.
  • Faster approvals: for off-stream projects, and use of existing reservoirs and abandoned mines.

Significance

  • Long life (50+ years) and large-scale, long-duration storage.
  • Supports grid stability and renewable energy integration.
  • Uses domestic technology, with no critical mineral dependence.
  • Lower cost per kWh for long-duration storage than batteries.

Challenges

  • High upfront cost and long construction periods.
  • Land, forest and environmental clearances.
  • Ecological concerns for on-stream projects (river flows, displacement).
  • Location constraints (suitable topography and water).
Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted

Pumped Storage Hydropower

Got a question? We're here to help!

Our dedicated Student Support team is ready to assist you and guide you every step of the way.
Reach out to us, and let’s tackle your queries together!

Copyright © 2026 USARAMBHA EDUCATION (UnderStand UPSC). All Rights Reserved.

0
Would love your thoughts, please comment.x
()
x
Call Now · 83770 72252