Pancheshwar Multipurpose Project

The Pancheshwar Multipurpose Project is the largest planned India-Nepal water project and the centrepiece of the Mahakali Treaty (1996). Thirty years after the treaty, its Detailed Project Report (DPR) is still not finalised, which makes it a symbol of both the potential and the trust deficit in India-Nepal water cooperation.

About the Project

  • It is planned on the Mahakali river (called Sharda in India), which forms the western border between Nepal and India’s Uttarakhand, near its confluence with the Sarju.
  • It envisages a 315-metre-high rock-fill dam, which would be among the tallest in the world, with a smaller re-regulating dam at Rupaligad downstream to even out water releases.
  • Its proposed capacity has changed between studies, from 6,480 MW in early plans to around 4,800-5,040 MW in recent DPR versions.
  • It is meant to provide hydropower, irrigation and flood control.

Institutional Progress

  • The Mahakali Treaty required the DPR to be finalised within six months of the treaty, but this did not happen.
  • The Pancheshwar Development Authority (PDA) was set up in 2014, after its terms of reference were signed during the Indian Prime Minister’s visit to Nepal in August 2014.
  • India’s WAPCOS prepared the DPR, but a Team of Experts from both sides has repeatedly failed to resolve differences.
  • The Joint Committee on Water Resources was due to meet in September 2026, its first meeting in four years, with Pancheshwar on the agenda.

Why the DPR is Stuck

  • Water rights: The treaty gives both countries “equal entitlement” to the river’s waters without prejudice to existing uses, but the two sides interpret this differently.
  • Irrigation benefits: The draft DPR estimates irrigation benefits for a much larger area in India (around 1.6 million hectares) than in Nepal (about 93,000 hectares). Nepal wants India to pay for these downstream benefits.
  • Cost sharing and power pricing: The treaty says costs will be shared in proportion to benefits, but valuing irrigation and flood control is contested.
  • Political sensitivity: The Mahakali’s origin is linked to the Kalapani-Lipulekh boundary dispute.

Environmental and Social Concerns

  • The reservoir would submerge large areas in Uttarakhand (Champawat, Pithoragarh and Almora districts) and Nepal (Darchula, Baitadi and Dadeldhura districts), displacing thousands of families.
  • The region is seismically active, raising safety concerns about such a high dam.
  • Impacts on river ecology, including fish species such as the golden mahseer, have been raised by environmental groups.

Significance

  • It could generate around 12 billion units of clean electricity a year, provide irrigation to the Gangetic plains and moderate floods.
  • It would make Nepal a major electricity exporter and help India meet its clean energy goals.

Way Forward

  • Settle the principles of water sharing and benefit valuation through the Joint Committee on Water Resources.
  • Conduct transparent environmental and social impact assessments with fair rehabilitation.
  • Use the momentum of growing power trade to build trust for larger projects.
Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted

Pancheshwar Multipurpose Project

Got a question? We're here to help!

Our dedicated Student Support team is ready to assist you and guide you every step of the way.
Reach out to us, and let’s tackle your queries together!

Copyright © 2026 USARAMBHA EDUCATION (UnderStand UPSC). All Rights Reserved.

0
Would love your thoughts, please comment.x
()
x
Call Now · 83770 72252