About the Jaynagar-Janakpur-Bijalpura Railway
This railway is the most visible symbol of India-Nepal connectivity. It revived a historic link, gave Nepal its first broad-gauge passenger railway, and is now set to carry pilgrims directly between Janakpur and Ayodhya.
History of the Line
- The original Nepal Janakpur Railway was a narrow-gauge line built in 1937 during British rule, mainly to carry timber from the forests of Nepal’s Terai to India.
- It linked Jaynagar (Madhubani district, Bihar) with Janakpur and Bijalpura. Over the decades, it became poorly maintained, and services stopped in 2014 so that it could be converted to broad gauge.
- In 2010, India and Nepal agreed to develop five cross-border rail links, and the Jaynagar line was the first to be taken up.
The Project
- The Jaynagar-Bijalpura-Bardibas line is about 69 km long and is fully funded by an Indian grant of about ₹784 crore. It was built by IRCON International, an Indian public sector company.
- It is being built in three phases:
| Section | Length | Status |
|---|---|---|
| Jaynagar-Kurtha (via Janakpur) | About 35 km | Inaugurated on 2 April 2022 by the Prime Ministers of India and Nepal |
| Kurtha-Bijalpura | About 17 km | Opened on 16 July 2023 |
| Bijalpura-Bardibas | About 17-18 km | Work resumed in July 2026 after land compensation disputes were settled |
- Trains are run by the Nepal Railway Company using diesel-electric multiple units supplied by India’s Konkan Railway. Passenger travel was initially limited to Indian and Nepali citizens.
Recent Developments
- A trial run of a 464-km Janakpur-Ayodhya train was conducted in November 2026, linking Janakpur, traditionally regarded as the birthplace of Sita, with Ayodhya.
- Nepal’s railway officials have said that the service is likely to be flagged off during Nepal Prime Minister Balendra Shah’s visit to India in late November 2026. Indian Railways will initially operate the train, starting with one round trip a week.
Wider Rail Connectivity with Nepal
- The five agreed links are Jaynagar-Bardibas, Jogbani-Biratnagar, New Jalpaiguri-Kakarbhitta, Nautanwa-Bhairahawa and Nepalganj Road-Nepalganj.
- The Jogbani-Biratnagar line (about 18 km) was inaugurated in June 2023 and connects to a customs yard in Biratnagar.
- On 13 November 2025, the two countries signed a Letter of Exchange amending the protocol to the Treaty of Transit. It allows direct rail freight, including bulk cargo, from Indian ports to stations inside Nepal without transshipment at the border. The first direct commercial freight train, carrying canola from Kolkata Port, reached Biratnagar in July 2026.
- The older Raxaul-Birgunj rail link to the Birgunj Inland Container Depot remains Nepal’s main gateway for container trade.
Significance
- Religious and cultural tourism: Strengthens the Ramayana Circuit and the shared Mithila culture of Bihar and Nepal’s Madhesh Province.
- Local economy: Cheaper and faster travel for traders, students and workers in a densely populated border region.
- Diplomatic value: A visible, people-friendly project that counters the perception of slow Indian delivery.
Challenges
- Land acquisition and compensation disputes delayed the last section for years.
- Low revenue: Nepal Railway Company has been running at a loss, raising questions about long-term operation and maintenance.
- Border formalities: Smooth immigration and customs procedures are needed for longer services such as Janakpur-Ayodhya.




