New Batch Starts 30 Nov: UPSC GS Foundation 2028/29 Enroll Now

Motihari-Amlekhgunj Petroleum Pipeline

Nepal imports all its petroleum products, and almost all of it comes from India through the Indian Oil Corporation (IOC), Nepal’s sole supplier under a long-term agreement. The Motihari-Amlekhgunj pipeline replaced much of the tanker traffic that used to carry this fuel across the border, making it South Asia’s first cross-border petroleum products pipeline.

About the Pipeline

  • It runs about 69 km from IOC’s depot at Motihari (East Champaran, Bihar) to Nepal Oil Corporation’s depot at Amlekhgunj (Bara district, Madhesh Province).
  • Its foundation was laid in April 2018, and it was jointly inaugurated by the Prime Ministers of India and Nepal on 10 September 2019, well ahead of schedule.
  • It was built by IOC with Indian funding and has a capacity of about 2 million tonnes a year.
  • Nepal first received diesel through it, and petrol and kerosene were added in early 2025.

Why it Matters

  • Lower cost: Pipelines are cheaper and faster than tankers and reduce losses during transport. Nepal Oil Corporation has reported significant savings since the pipeline began operating.
  • Less congestion and pollution: Fewer tankers on the roads to Birgunj reduce traffic, accidents and emissions.
  • Energy security: A steady, protected supply line is less vulnerable to disruptions at the border, which Nepal experienced during the 2015 blockade.

Expansion

ProjectLengthPurpose
Amlekhgunj-Lothar (Chitwan)About 62 kmExtends the existing pipeline into central Nepal, with a large storage terminal at Lothar; work began in August 2025 with an Indian grant
Siliguri (West Bengal)-Charali (Jhapa)About 50 km (35 km in India, 15 km in Nepal)A new pipeline to supply eastern Nepal and Koshi Province, with a terminal at Charali
  • These projects follow an MoU signed during the Nepali Prime Minister’s visit to India in 2023 and a business-to-business framework agreement between IOC and Nepal Oil Corporation.
  • Nepal has also proposed receiving aviation turbine fuel through the extended pipeline, and the two sides have discussed a gas pipeline from Gorakhpur to Bhairahawa.

Significance for Regional Energy Connectivity

  • It is one of two operational cross-border petroleum pipelines linked to India. The other is the India-Bangladesh Friendship Pipeline (Siliguri to Parbatipur, about 131 km), inaugurated in 2023.
  • Together with power trade and grid links, it supports India’s goal of an integrated eastern South Asian energy network.

Concerns

  • Dependence: Some in Nepal worry that deeper reliance on Indian supply increases vulnerability, although the pipeline itself reduces disruption risks.
  • Capacity: Rising demand means the existing line cannot meet all of Nepal’s needs, making timely completion of the extensions important.
Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted

Motihari-Amlekhgunj Petroleum Pipeline

Got a question? We're here to help!

Our dedicated Student Support team is ready to assist you and guide you every step of the way.
Reach out to us, and let’s tackle your queries together!

Copyright © 2026 USARAMBHA EDUCATION (UnderStand UPSC). All Rights Reserved.

MAD-X for UPSC Prelims 2027 – Batch 3 starts 7th December 2026
Batch 3 · Starts 7th Dec 2026

MAD-X for UPSC Prelims 2027

Online & Offline · Fee details + free counselling

Preferred Medium

🔒 Your details are kept confidential.

0
Would love your thoughts, please comment.x
()
x
Call Now · 83770 72252