Project and River-Basin Context
The Parbati–Kalisindh–Chambal (PKC) Link Project is part of India’s Inter-Linking of Rivers Programme under the National Perspective Plan. It is intended to improve utilisation of water within the Chambal river system, mainly across Madhya Pradesh and Rajasthan.
The original PKC proposal has now evolved into the Modified Parbati–Kalisindh–Chambal (MPKC) Link Project, integrating:
- components in the Kuno, Parbati and Kalisindh sub-basins proposed by Madhya Pradesh;
- components of Rajasthan’s Eastern Rajasthan Canal Project (ERCP);
- links involving the wider Chambal, Mej and Banas systems.
The Modified PKC project was declared a priority interlinking project under the National Perspective Plan in 2022.
Objectives and Institutional Progress
The project seeks to improve water availability for:
- drinking water supply;
- irrigation;
- drought-prone areas of eastern Rajasthan and parts of Madhya Pradesh;
- more efficient utilisation of the Chambal basin’s available water resources.
A major breakthrough came when the Government of India, Rajasthan and Madhya Pradesh signed an MoU on 28 January 2024, followed by a Memorandum of Agreement on 5 December 2024 for implementation of the Modified PKC project.
Under the agreed framework, Rajasthan is to utilise about 3,309.83 MCM of water, including around 1,744.16 MCM for drinking water.
As of the latest official updates, the Detailed Project Reports for Rajasthan components have been completed and submitted to the Central Water Commission for techno-economic appraisal.
Significance and Challenges
The Modified PKC project is important because it attempts to resolve a long-standing Centre–State and inter-State water-development issue through an integrated basin approach.
Its expected benefits include:
- improved irrigation coverage;
- drinking-water security;
- drought mitigation;
- better utilisation of Chambal-system water;
- greater coordination between Rajasthan and Madhya Pradesh.
However, major challenges remain:
- determining dependable and environmentally sustainable water availability;
- inter-State allocation and operational coordination;
- land acquisition and rehabilitation;
- ecological impacts of reservoirs, canals and altered river flows;
- ensuring that downstream requirements of the Chambal system are not compromised.
The project is particularly significant because, after the Ken–Betwa Link Project, it represents another major attempt to move India’s river-interlinking programme from planning toward implementation through formal inter-State agreement and integrated basin planning.